Laserfiche WebLink
CLEARWATER <br />' C R O U P <br /> • Enviranmenlaf Serv.ces <br /> I <br /> 7.5 Preparation Remedial Action Plan <br />' The results of Natural Attenuation/ Enhanced Bio-Remediation pilot testing will be presented in <br /> a Remedial Action Plan (RAP) If the results of pilot testing are positive, the RAP will provide a <br />' detailed proposal for the installation of an iSOC system, and will identify wells to be used in the <br /> remediation system The RAP will also describe envisioned remediation process flow, system <br /> layout, equipment type, permit requirements, and start-up and monitoring activities It is <br />' anticipated that information contained in the RAP will be sufficient for system construction The <br /> RAP will be reviewed and signed by a California Registered Geologist at Clearwater Following <br />' SJCEHD approval of the RAP, the system installation will begin <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> 1 <br /> • <br /> 1 <br /> ZB178C CAP 22 November 20,2002 <br />