Laserfiche WebLink
CLEARWATER <br /> G R O U P <br /> Environmental Services <br /> r <br /> ITABLE OF CONTENTS <br /> (CONTINUED) <br /> 70 PROPOSED CORRECTIVE ACTION SCHEDULE 20 <br /> 71 Purpose 20 <br /> 7 2 Proposed Schedule - 20 <br /> 7 3 Groundwater Monitoring Schedule 20 <br /> 7 4 Pre-Remediation Design Pilot Testing 21 <br /> 7 5 Preparation of Remedial Action Plan 22 <br /> 80 CERTIFICATION 23 <br /> ITABLES <br /> Table 1 Well Construction Data <br /> Table 2 Cumulative Soil Sample Analytical Results <br /> ITable 3 Groundwater Elevations and Sample Analytical Results <br /> Table 4 Calculation of Residual Sorbed-Phase TPHg Mass <br /> Table 5 Calculation of Residual Dissolved-Phase TPHg Mass <br /> FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Sorbed-phase Hydrocarbon Distribution Map <br /> Figure 4a Cross Section A-A' <br /> Figure 4b Cross Section B-B' <br /> Figure 5 Groundwater Elevation Contour Map— 9130102 <br /> Figure 6 Dissolved-Phase Contaminant Distribution Map—9/30/02 <br /> Figure 7 Dissolved-Phase TPHg Distribution Map — 9/30/02 <br /> Figure 8 Anticipated iSOC Well Network <br /> Figure 9 Dual-Phase Extraction & Air Sparge Well Layout <br /> APPENDICES <br /> Appendix A Clearwater Field Protocols <br /> Appendix B Boring Logs <br />' Appendix C Clearwater Groundwater Monitoring Field Data Sheets <br /> Appendix D Laboratory Reports and Chain-of-Custody Forms <br />' Appendix E Breakdown of Potential Remedial Costs <br /> Appendix F iSOC Information <br /> IZB178C iii November 20,2002 <br />