Laserfiche WebLink
CILEAnWAA <br /> R <br /> GROUP , INC <br /> FIELDWORK REQUEST FORM <br /> Job# ZB178C Customer # 500 <br /> Project � <br /> Name 9artv j / C <br /> Project Address 1817 S Fresno Avenue, Stockton, CA <br /> Date of Work Request 4/10/2002 <br /> Type of Field Work 2nd Quarter 2002 groundwater monitoring <br /> Monitoring wells MW-1, MW-2, MW-3, MW-4, MW-5B <br /> MW-6, MW-7, MW-8 <br /> IMPORTANT Take 1 drum and do drum inventory <br /> check "yes" for EDF report on lab chain-of custody <br /> mark locations of DPW-1 and SP-1 on site plan <br /> measure distance from DPW-1 to MW-5B and SP-1 <br /> Budget mileage 130 miles <br /> i <br /> Tracking Codes <br /> (let me know if you go 2240 Monitor Well Sampling 10 hours ($60/hr) <br /> over) 2290 Travel 4 hours ($60/hr) <br /> Lab Kiff <br /> Analyses TPHg EPA Method 8260 <br /> BTEX EPA Method 8260 <br /> MTBE EPA Method 8260 <br /> Requested by Adam Newman <br /> Attachments Site location and site maps, purge calc sheet from previous event, <br /> Field equipment and billing materials sheet <br /> Field Geologist Scott Robertson <br /> Date Scheduled Anytime in April or May 2002 <br />