Laserfiche WebLink
C L E A kWA'T-E R <br /> G R O U P <br /> Env:ronmrrs taf Servects <br /> borehole location for the dual-phase test well is shown in Figure 1 Tentative well construction details <br /> are attached <br /> The well will be constructed of clean, flush-threaded, PVC well materials Well screen, with 0 02-inch <br /> perforations,will extend from the bottom of each boring to the top of known sorbed phase contamination <br /> approximately 10 feet bgs, and blank casing will be extended to ground surface A filter pack of <br /> Lonestar#3 sand will extend from the bottom of each boring to one foot above the screened interval The <br /> filter pack will be sealed by a one-foot layer of hydrated bentonite The remaining annular space will <br /> be filled with cement and a tamper-resistant box will be concreted in place over the wellhead flush <br /> with the ground surface <br /> Following installation, Clearwater will survey the top of casing elevation, accurate to within ±0 01- <br /> feet MSL, and relative to at least two existing monitoring wells on-site where the casing elevation is <br /> already known <br /> An electronic water level indicator,accurate to within t0 01-foot,will be used to gauge depth to water <br /> The well will be checked for the presence of separate-phase hydrocarbons (SPH) prior to development <br /> The well will be developed by surging and bailing Development will involve the removal of water <br /> from the well until such tune that it is relatively free of sediment, and pH, temperature, and <br /> conductivity parameters have stabilized Well purging information will be recorded on Gauge <br /> Data/Purge Calculations and Purge Data sheets <br /> It is anticipated that the test well will be actively used during full-scale remedial system operation if <br /> these methods prove to be effective in remediation of the site <br /> Proposed air sparge point installation <br /> The air sparge point will be constructed of clean, flush-threaded, two-inch diameter PVC well <br /> materials and constructed such that the top of the screen is submerged at least 8 feet throughout the <br /> year Based on the maximum depth to water at approximately 14 feet bgs, the well will be screened <br /> with 0 02-inch perforations from approximately 22 to 25 feet bgs Blank casing will be extended from <br /> the top of the screened portion to ground surface A filter pack of Lonestar#3 sand will extend from the <br /> bottom of the boring to one foot above the screened interval The filter pack will be sealed by a two- <br /> ZBI78C Workplan for remedzaI feasibility testing 7 August 200I <br />