Laserfiche WebLink
SOIL BORING AND WELL CONSTRUCTION LOG: IW--1 Page:1 of 1 <br /> CLEARWATER GROUP-TAG INC. Project:ZB178D <br /> S.Fresno Ave. 1 __ DRILLING CONTRACTOR: BORING DIAMETER: CLIENTACCATION: <br /> MW-6 p rn ® �p 02 <br /> 03 <br /> Gregg Drilling 11 inches Barnes Trucking-Stockton,CA <br /> -.' 12_x` DRILL RIG OPERATOR: BORING DEPTH: SCREEN SLOT SIZE: DRILLING DATE: <br /> other 10 7 b 5 4 Eugene Nunes 25 feet 0.02 inches 8/9/2004 <br /> Ga�a�''- ®9 08 DRILL RIG TYPE: WELL DEPTH: WELL MATERIAL: FILTER PACK: <br /> I"'' MWA CMB-75 25 feet 2"sch40 PVC 2/12 Lonestar <br /> WELL SEAL:Neat Cement over hydrated PLANNED USE: LOGGED BY: <br /> MW-zInjection Well J.Daley <br /> MW-3 Drawing not to scale bentonite <br /> SAMPLIN U SAMPLING METHOD: MONITORING INET: APPROVED BY: <br /> u 8 plp Jim Jacobs C.H.G <br /> Not Sampled <br /> a ZO pu FIRST ENCOUNTERED WATER DEPTH: STATIC WATER DEPTH: 11.5 ft. <br /> o° Not Observed Q <br /> a DATE: 8/11/04 T <br /> - <br /> f��`��r` 12"Concrete <br /> SM <br /> afi.�fisfiifi.� <br /> z t�%�tafi.�a <br /> r:c�1 3 i Note: Soil descriptions based on observations of drill cuttings-no SPT sampling performed. <br /> 4 ° /S C Silty to Clayey SAND (SM/SC),brown to gray,damp to moist. <br /> fi fiY���Y <br /> 6 t aSsdfi <br /> 7 7 '�i6,dfird <br /> fiitsa <br /> ` 10 <br /> 11 11 <br /> I:cC-i3 — <br /> .t'�l _ 12 <br /> 13 <br /> 14 <br /> 16 <br /> j = 17 Sandy to Clayey SILT(ML),gray,moist to wet. <br /> — <br /> is MI' Note: Soil descriptions based on observations of drill cuttings-no SPT sampling performed. <br /> — 19 <br /> 20 <br /> — 21 <br /> — <br /> 22 <br /> — 23 <br /> — 24 <br /> 3 — End Boring @ 25 feet bgs. <br /> 2s <br /> 27 <br /> �f <br /> 29 <br /> `..l <br /> 31 <br /> =`l 33 <br /> 35 <br />