Laserfiche WebLink
.......... <br /> ...... ... . . <br /> -------------- <br /> SOIL BORING AND WELL CONSTRUCTION LOG: IW-4 Page:1 of 1 <br /> CLEARWATER GROUP-TAG INC. Project: ZB178D <br /> S_Fresno Ave. 11 DRILLING CONTRACTOR: BORING DIAMETER: CLIENT/LOCATION: <br /> z Gregg Drilling 11 inches <br /> Barnes Trucking-Stockton,CA <br /> 2 3 <br /> DRILL RIC OPERATOR: BORING DEPTH: SCREEN SLOT SIZE: DRILLING DATE: <br /> 1210 <br /> 7 6 5 4 Eugene Nunes 25 feet 0,02 inches 8/10/2004 <br /> j? 3 Office! <br /> WELL DEPTH: WELL MATERIAL: FILTER PACK' <br /> MW-1 9 8 DRILL RIG TYPE: <br /> MW-4 CME-75 25 feet 2"sch 40 PVC 2/12 Lonestar <br /> wFLLsEAL-.Neat Cement over hydrated PLANNED USE: LOGGED BY: <br /> A MW-2 <br /> Injection Well J.Daley <br /> MW-3 Drawing not to scale bentonite <br /> MONITORING INST: APPROVED BY: <br /> SAM LINC SAMPLING METHOD;.:YVJim Jacobs C.H.G <br /> Not Sampled PID <br /> Lu <br /> Q FIRST ENCOUNTE"D WATER DEPTH: sTAnc WATER DEPTH: It.7 ft. <br /> HnP 0 <br /> 0� UOU Not observed Q DATE: 8/11/04 <br /> 12"Concrete <br /> fgYfiYfiYfiY <br /> 2 <br /> 3 sampling performed. <br /> Note: Sail descriptions based on observations of drlll cuttings-no SPT <br /> 4 /SCFSilty to Clayey SAND(SM/SC)brown to gray,damp to moist. <br /> F4 <br /> pykYwX <br /> 6 <br /> fi.afisOY fis <br /> B <br /> fistdSfi <br /> — 9 <br /> W 10 <br /> 11 <br /> 12 <br /> 13 <br /> 16 <br /> 17 Sandy to Clayey SILT(ML),gray,moist to wet. <br /> 18 Note; Soil descriptions based on observations of drill cuttings-no SPT sampling performed. <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> r-d 24 <br /> End Boring @ 25 feet bgs. <br /> 25 - <br /> 27 <br /> 29 <br /> 31 <br /> 'k5 <br /> 33 <br />