Laserfiche WebLink
-- c <br /> SOIL BORING AND WELL CONSTRUCTION LOG: IW-7 Page:1 of 1 <br /> CLEARWATER GROUP-TAG INC. Project: ZB178D <br /> - — <br /> 5.Fresno Ave. -1 DRILLING CONTRACTOR: BORING DIAMETER: CLIENT/LOCATION: <br /> MW-6@ p� ® �® p 2 Q 3 Gregg Drilling 11 inches Barnes Trucking-Stockton,CA <br /> ?�_....._ 0 DRILL RIG OPERATOR: 13ORING DEPTH: SCREEN SLOT SIZE: DRILLING DATE: <br /> Office/ 10 7 6 4 Eugene Nunes 25 feet 0.02 inches <br /> 8/10/2004 <br /> Garage ®9 Og DRILL RIG TYPE: WELL DEPTH: WELL MATERIAL: FfL"rER PACK: <br /> """"' MW-4 CME-75 25 feet 2"sch 40 PVC 2/12 Lonestar <br /> WELL SEAL:Neat Cement over hydrated PLANNED USE: LOGGED BY: <br /> MW-2 g bentonite Injection Well r.Daley <br /> MW-3 Drawin not to scale <br /> SAM LING U SAMPLING METHOD: MONITORING INST-. APPROVED BY: <br /> Jim Jacobs C.H.G <br /> Not Sampled PID <br /> �., y D �n p FIRST ENCOUNTERED WATER DEPTH: STATIC WATER DEPTH: 11.5 ft. <br /> 0 5 <br /> o H A 3 o� o o Not Observed DATE: 8/11/04 1 <br /> ' 12"Concrete <br /> 2dgfiyfi <br /> SM r <br /> 3 r Note: Soil descriptions based on observations of drill cuttings-no SPT sampling performed. <br /> 4 : /S C s <br /> s,�r�},•rig;/ Silt to Clayey SAND(SM/SC)brown to gray,damp to moist. <br /> 6 fifiafidfia <br /> 1} q�fi�fi+Yfi�Y <br /> C=-J g fi.S�dfi.dfi.6 <br /> fid�4fidfik <br /> fi,Sfi4fi. fiS <br /> 9 fi�dfidfij 4fi.4 <br /> 10 <br /> — 11 <br /> 12 <br /> 13 <br /> ### 14 <br /> 16 <br /> 17 <br /> _ Sandy to Clayey SILT(ML),gray,moist to wet. <br /> 18 MI' Note: Soil descriptions based on observations of drill cuttings-no SPT sampling performed. <br /> 19 <br /> 20 <br /> 21 <br /> — 22 <br /> — 23 <br /> { — 24 <br /> End Boring @ 25 feet bgs. <br /> 25 <br /> 27 <br /> i <br /> 29 <br /> r <br /> 31 - <br /> 33 <br /> 35 <br />