Laserfiche WebLink
-� <br /> Bear Creek.Winery ASE• • <br /> Lodi. San Joaquin Co. <br /> Monitoring Well lwtallation Proposal <br /> Health anti&1&tv Plan <br /> Upon arrival at the site, each member of the drilling team will be given a local map on <br /> which the route to Lodi Memorial Hospital is clearly marked The route will also be <br /> described verbally to each person. A cell telephone will be present at the drilling site for <br /> the duration of activities there. <br /> B. Drilling Details <br /> Hollow-flight augers(nominal 10"OD, 4 7/8"Ill) will be used to drill. Logging will be <br /> accomplished from continuous cores taken through the interior of the augers. The <br /> expected total depth is 40 to 50 feet. <br /> C. Monitoring WeU Design <br /> The proposed design of the wells is shown on Figure 2. The screened intervals of the <br /> wells will cover the first saturated interval. They will not begin less than 10 feet beneath <br /> the existing ground surface. They will not bridge two apparently separate hydrologic <br /> units. They will be long enough so that they we can reasonably expect them to intersect <br /> water even during low water table conditions. During high water table conditions, the <br /> water table is likely to be higher than the top of the perforated interval. <br /> The sand pack and screen size will be as shown on the figure(0.020" slots, Number 3 <br /> sand) if the water-bearing stratum targeted is medium sand or coarser. If the screen needs <br /> to be placed in fine or silty sand, 0.010" slots will be used. 'Threaded casing will be used <br /> throughout. Bentonite added to the grout mix will be at least 3 percent by weight but less <br /> than 5 percent to assure the grout will not shrink excessively. Ah grout will he placed <br /> with a tremie pipe. <br /> D. Well Development <br /> Development of the wells will not occur until more than 24 hours after the grout has been <br /> placed. The wells will be developed by alternately swabbing and pumping with a 0.5 hp <br /> submersible pump. The procedure will continue until the turbidity of water delivered by <br /> the pump after three casing-volumes have been purged is less than 5 NTU The <br /> development water will be placed in the adjacent infiltration area. <br /> E. Surveying <br /> A licensed land surveyor will be hired to measure the elevations (to within 0.01 foot) of <br /> the tops of the plastic casings and to locate them (to within 1 foot)on a rational <br /> coordinate system <br /> G. Well Sampling <br /> The wells will be sampled for the first time at least 48 hours after completing the <br /> development. The wells will be purged of 3 casing volumes using a 24-volt submersible <br /> pump. The purge water wiil continuously pass through a measuring cell and the pH, EC, <br /> and Temperature will be recorded at intervals. The pump carries a disposable <br />