Laserfiche WebLink
• Page 1 of 3 <br /> John Yoakum [EH] <br /> From: John Cooper Dcooper@gercorp.com] <br /> Sent: Friday, October 26, 2012 9:40 AM <br /> To: John Yoakum [EH] <br /> Subject: RE: Ripon Treatability Study work plan approval from RWQCB <br /> Johnny, <br /> Please speak with Vicky M. During earlier conversations with her, she told me the cost for two permits <br /> a re: <br /> $375—permit <br /> $375—new account PR <br /> $125 - borings <br /> Please let me know if that is not correct. <br /> Thanks. <br /> John <br /> From: John Yoakum [EH] [mailto:JYoakum@sjcehd.com] <br /> Sent: Friday, October 26, 2012 9:25 AM <br /> To: John Cooper <br /> Subject: RE: Ripon Treatability Study work plan approval from RWQCB <br /> John, <br /> I have your papers, but I am a little confused. <br /> I have your two applications. <br /> There is one for each of the 2 parcels owned by the Ripon Farm Service. <br /> The fees are: <br /> $375 for the Master File Record (MFR) <br /> $375 for the inspection activity fee <br /> $125 for the first boring (injection) permit. <br /> That totals $875. <br /> There is a second parcel with a permit for one injection well and 3 borings. <br /> There would be a permit fee of$125 on that permit. <br /> I have a check for $875. <br /> Is there another check that I am not aware of to cover the permit fee? <br /> I seem to be $125 short for issuing the permit. <br /> Let me know if there is another check or electronic payment that I can use. <br /> This is held up until I can balance out all the money. <br /> 11/6/2012 <br />