My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0527598
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 5:46:48 PM
Creation date
1/15/2020 4:45:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527598
PE
2960
FACILITY_ID
FA0018700
FACILITY_NAME
RIPON FARM SERVICES
STREET_NUMBER
932
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102011
CURRENT_STATUS
01
SITE_LOCATION
932 FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OWOFF <br /> Electric Boxes FMM Pump Power Cables <br /> 00 <br /> 2"PVC SCH 80 <br /> Xk <br /> —Cover <br /> 1 X12'PVC Casing <br /> 2 <br /> 1 <br /> —Well Lid <br /> 6"PVC SCH 40 <br /> �/ \ Gravel Bed <br /> / ~and Cover <br /> X <br /> Cement/Grout <br /> Mixture <br /> 1 <br /> 1"PVC SCH 80 <br /> Sounding Water <br /> Level Tube <br /> Grundfos Well Pump <br /> i <br /> i <br /> WELL I-IEAD DETAIL <br /> Groundwater Extraction Work Plan <br /> R.F.Land,Inc. <br /> 938 Frontage Road,Ripon,California <br /> GENESIS ENGINEERING & REDEVELOPMENT Designed: vA Project Number: 143_U_2 Figure <br /> 351 Ruess Road Ripon, CA 95366 8 <br /> Drawn: DH File: 143U2 4 <br /> Tel:209.599.2004 Fax:209.433.3990 <br /> www.gercorp.com Checked: Sv Revision: xzxxx Date:07/30/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.