My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
938
>
2900 - Site Mitigation Program
>
PR0536568
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 5:30:19 PM
Creation date
1/15/2020 4:52:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536568
PE
2960
FACILITY_ID
FA0020996
FACILITY_NAME
RIPON FARM SERVICES (AKA RF LAND)
STREET_NUMBER
938
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102006-07
CURRENT_STATUS
01
SITE_LOCATION
938 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> GrEtErst <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> August 24, 2011 <br /> Ripon Farm Service <br /> Soil Boring Work Scope <br /> Genesis Engineering &Redevelopment, Inc. plans to advance up to 10 boreholes each on <br /> parcels 261-020-06 and 261-020-07. A direct push drill rig will advance the boreholes to <br /> just above the water table, estimated depth 25 feet below grade. Continuous soil samples <br /> will be collected for the purpose of lithologic description and laboratory testing for <br /> nitrate. This work is being done to better delineate areas on the site that have nitrate <br /> concentrations in soil above the site specific soil cleanup concentration. This work is not <br /> being done under the direction of the Regional Water Quality Control Board, and as such <br /> no formal work plan has been prepared. <br /> A figure is attached to each permit application identifying the parcel on which the soil <br /> borings will be advanced. Boring locations will be determined in the field. Boring <br /> identification numbers will be designated as the boreholes are advanced. <br /> 9�� 46� - <br /> John D. Cooper <br /> Senior Project Geologist <br /> Genesis Engineering &Redevelopment, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.