My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002514
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GERTRUDE
>
300
>
3500 - Local Oversight Program
>
PR0545189
>
ARCHIVED REPORTS_XR0002514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 1:10:15 PM
Creation date
1/16/2020 11:58:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002514
RECORD_ID
PR0545189
PE
3528
FACILITY_ID
FA0005174
FACILITY_NAME
SUSD-FRANKLIN HIGH SCHOOL
STREET_NUMBER
300
Direction
N
STREET_NAME
GERTRUDE
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14331006
CURRENT_STATUS
02
SITE_LOCATION
300 N GERTRUDE AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R <br /> TABLE 2: ESTIMATED CONSTRUCTION COSTS FOR REMEDIAL ALTERNATIVES <br />. STOCKTON UNIFIED SCHOOL DISTRICT <br /> FRANKLIN HIGH SCHOOL <br /> HLI 0089003 <br /> ALTERNATIVE I - IN-SITU VAPOR EXTRACTION <br /> Assumptions. <br /> • Dimensions of soil to be remediated in place - 10-foot radius, 20 feet deep <br /> • Vapor extraction wells - 9 wells, 20 feet deep <br /> • Suitable electrical panel available at nearby building <br /> Estimated Cost: <br /> Vapor extraction wells and manifold piping <br /> 9 wells CM $800 ea. $7,200 <br /> Blower and vapor recovery system <br /> 5 HP motor, 100 cfm pump, mist eliminator, <br /> two carbon canisters and gauges 8,000 <br /> Concrete foundation 1,000 <br /> Electrical panel and conduit 3,000 <br /> is Fencing 1,000 <br /> Air emissions permit 5,000 <br /> Engineering - Workplan, specifications, 15,000 <br /> closure report <br /> Contingency 0 20% 8,000 <br /> ESTIMATED COST FOR ALTERNATIVE 1 14&990 <br /> (rounded to nearest thousand) <br /> ALTERNATIVE 2 - EXCAVATION AND OFFSITE DISPOSAL <br /> Assumptions: <br /> • Volume of soil to be disposed of - 18-foot square, 20 feet deep, <br /> with 1.15 expansion factor (280 cu. yd.) <br /> • Volume of soil to be excavated and backfilled - 240 cu. yd. <br /> • No shoring required <br /> • Disposal facility - Class II or III facility permitted for hydrocarbon fuels <br />
The URL can be used to link to this page
Your browser does not support the video tag.