Laserfiche WebLink
t+0A110 Of TRUSTEES SAN JOAQUIN LOCAL HEALTH DISTRICT <br /> J&rn*• Cvlbwtson. P,,,,,,. SERVING <br /> ►•tricta E. Vannvtd. S,,c'y. City of Lodi <br /> AniAonolfa,Van Spton24n 1601 East Hazelton Avenue. P. o. Box 200'9 San Joaquin County <br /> E..t PlinantN Stockton. California 95201 City of Esc.lon <br /> f"n 8W9b** City of Manteca <br /> o.ni.t L. Flwos 209/466-6781 Cur of Ripon <br /> John 0. Maat. M.O. Cltr of Stockton <br /> 1N1111401 J.Wade Joel Khanna. M.O.. M.P.H., District Naalth offkar Gtr of Tracy <br /> dory Anna love San Joaquin County <br /> San Joaquin Coun�r <br /> Faci l i ty Name la nl N IG-W grant <br /> Address <br /> Date of Inspection Inspector •KPsr:y L. 1=�„��r <br /> P— —FCO &AU104 RECWLAP, <br /> MONITORING ALTERNATIVE #1 <br /> Limited to underground storage tanks which have infrequent inputs and withdrawals and <br /> where the Iigtlit: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> Annual precision test on tank andi in <br /> P P 9• <br /> flank gau ing performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> Tank must have no inputs or withdrawals for at least a 48 houreriod <br /> (2 days) at the end of consecutive periods lasting up to 7 days• <br /> (For example: tank in use Monday through Friday. then locked <br /> over weekend). <br /> Liquid level measurements are taken at the beginning and 9 9 end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> If liquid level varies more than 1% of the tank volume or 5all n <br /> s.ever is less, between measurements, an unauthorized release shall be which <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours . as per Article 5. Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> Precision tests) must be per fornK,d +vt &NN�Y and results submitted to hi <br /> office within 30 days of h t s <br /> �� y t e test. <br /> (�2.J Tank gauging must 6e started inrnediately. (See instructions above). <br /> If they above compliance dates cannot be met. contact this office prior to thf- specified <br /> date. <br /> 4/86 UGT 3 <br />