07 June 2012 <br /> AGE-NC Project No. 95-0184 <br /> Page 8 of 14 <br /> water, adsorbed petroleum hydrocarbons will be liberated and force hydrocarbon vapors <br /> into the vadose zone, where they can be withdrawn by the SVE system described above. <br /> 3.6. PREPARATION OF REPORT OF FINDINGS <br /> Remediation reports, along with the ongoing semi-annual ground water monitoring reports, <br /> will be prepared presenting the findings from SVE/IAS remedial activities. Additionally, a <br /> supplemental report will be prepared summarizing the findings of the above proposed <br /> remediation. Reports will include a description of work performed and the results of the soil <br /> vaporand ground water monitoring/sampling/analysis.Conclusions and recommendations <br /> will also be included in the reports, if applicable. Reports will be in a format acceptable to <br /> CVRWQCB guidelines, and will be reviewed and signed by a California Professional <br /> Geologist. <br /> 4.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of <br /> a California Registered Geologist. Procedures for pilot boring advancement, soil sample <br /> collection, well installation, development and survey are outlined below. <br /> 4.1. INSTALLATION OF SVE/IAS WELLS <br /> Four additional shallow-screened SVE wells and two shallow-screened (45-50 feet bsg) <br /> and two deep-screened (68-70 feet bsg) IAS wells will be installed at the southern UST <br /> area at the site. The SVE wells will be advanced to total depths of 35 feet bsg and IAS <br /> wells will be advanced to total depths of 50 feet and 70 feet bsg. Borings for all SVE and <br /> IAS wells will be advanced utilizing 8-inch diameter augers and a truck-mounted <br /> hollowed-stem auger drill rig. <br /> The SVE well pilot borings will be completed utilizing 2-inch diameter, Schedule 40 PVC, <br /> 0.020-inch slotted well screen installed from 10 feet to 35 feet bsg and blank casing <br /> extending to the surface. Shallow IAS well pilot borings will be completed utilizing 2-inch <br /> diameter, Schedule 40 PVC, 0.010-inch slotted well screen installed from 45 feet to 50 feet <br /> bsg and blank casing extending to the surface; Deep IAS well pilot borings will be <br /> completed utilizing 2-inch diameter, Schedule 40 PVC, 0.010-inch slotted well screen <br /> installed from 68 feet to 70 feet bsg and blank casing extending to the surface. <br /> Advanced GeoEnviron rental,Inc. <br />