My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT
>
308
>
2900 - Site Mitigation Program
>
PR0542014
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 5:32:07 PM
Creation date
1/16/2020 4:08:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0542014
PE
2960
FACILITY_ID
FA0023306
FACILITY_NAME
LARRYS AUTO REPAIR
STREET_NUMBER
308
Direction
N
STREET_NAME
GRANT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
308 N GRANT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02 September 2010 <br /> AGE-NC Project No. 95-0184 <br /> Page 7 of 7 <br /> The upper portion of the treatment chamber is also designed as a sieve with uniformly <br /> distributed openings to allow for volatilization of the ground water. The pick up tube from <br /> the base of the well extencj¢hrough the upper portion of the extraction chamber. The pick <br /> up tube spli"nd are equal distances from the ambient air supply pipe. The pick up tube <br /> extendjo the base of the well casing or the desired depth for ground water extraction. <br /> The bifurcated pick up tubes connect to and pass through the treatment chamber. The <br /> walls of the pick up tubes are exposed to the inside of the treatment chamber, which <br /> additionally have holes of a regular size and distribution in the sides of the pipes.The holes I rc' <br /> provided with air inlet openings in the region of the chamber underneath the upper portion <br /> of the extraction chamber wall;this forms the whole of the treatment chamber. <br /> Air which flows through the air inlet and out of the chamber into the pick up tubes, <br /> produces a suction which aspirates the ground water upwards.>T-Che extraction water is <br /> transported upwardly through the treatment chamber region (well casing). <br /> If required, a partition in the form of a packer can be installed in the lower portion of the <br /> well casing, through which the pick up tube extends. This could be installed if deep ground <br /> water was the target for extraction below the packer depth. <br /> Instead of the pick up tubes exposed to the inside of the treatment cell, it is also possible <br /> to provide for an individual pick up tube with a cross-section shaped as a hollow ring <br /> segment or wire wrapped. However, the technique which creates the superior air lift will be <br /> utilized, following start up. <br /> Reinforced circulating movement of the ground water develops through the pick up tubes <br /> in the treatment of the well casing and water is identified p-eatment discharge.A part of this <br /> discharge flow is discharged outwardly in direction he casing and filter pack, while <br /> another portion of the water volume moves in the direction downwardly. Ground water <br /> circulation through the treatment area is reinforced and simultaneously, with a vertical <br /> ground water movement to the surrounding area of the well casing {s amplified. <br /> Figure 3 illustrates an example of in-well air stripping technology implementation. <br /> Advanced GeoEnvironmen[al,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.