My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT
>
308
>
2900 - Site Mitigation Program
>
PR0542014
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 5:32:07 PM
Creation date
1/16/2020 4:08:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0542014
PE
2960
FACILITY_ID
FA0023306
FACILITY_NAME
LARRYS AUTO REPAIR
STREET_NUMBER
308
Direction
N
STREET_NAME
GRANT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
308 N GRANT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07 June 2012 <br /> AGE-NC Project No. 95-0184 <br /> Page 2 of 14 <br /> �G .44 <br /> i <br /> The concentrations of dissolved constituents collected in southern UST area (MW-5) sc�r .L <br /> shallow well samples are greaterthan the intermediate and deeper monitoringwells MW-4_ , <br /> and W-8). The concentrations of dissolved constituents collected in northern UST area C�{S 70 J <br /> ,,+ intermediate well samples are lowerthan the shallow vaporwell samples(MW-1 vs. 5c� . <br /> The maximum concentrations of analytes in samples collected in the northern UST release s5�_�s' <br /> ;t? area appear to reside in the upper 50 feet of the subsurface as demonstrated by groun 4. <br /> area <br /> Z �rec Z5 -40 r` P4oy/ <br /> V W-2R_ z , r'u <br /> ✓e/ <br /> VW-4 —33 S1-53.S' <br /> 2.0. RECOUNT OF SCOPE OF WORK V ws tv- 24.51 -41.5' <br /> 1:.W-1 - 30'- S#' <br /> Multiple feasibility studies have been preformed to evaluate remedial action options forthe <br /> site. The following is a list of work plans prepared for remediation feasibility testing: <br /> • Work Plan Addendum dated 15 December 1995, a soil vapor extraction (SVE) pilot <br /> test was proposed. <br /> • Feasibility Pilot Tests Work Plan dated 16 December 1999, an in-situ air sparging <br /> (IAS) pilot test and a ground water extraction pilot test were proposed to be <br /> performed at the site. <br /> • Well Installation and Feasibility Study Work Plan - November 2004 dated 19 <br /> November 2004, installation of a ground water extraction well and a ground water <br /> extraction pilot test were proposed. <br /> • Work Plan Addendum dated 18 February 2005, a ground water extraction pilot test <br /> was proposed. <br /> • Work Plan Addendum dated 29 September 2005, a second ground waterextraction <br /> well was proposed. <br /> • Soil Vapor Extraction Pilot Test dated 10 November 2005, a SVE pilot test was <br /> proposed. \14114101."Sa:/ ✓A/oi £xfeaztio, Pi)e+Te5f 'Repe.1-141,GWEX+radW,,, P,jot Stv"i <br /> .�+_ 3/ 9Ja9 \µ1iµ oc <br /> • Quarterly Report - Fourth Quarter 2009 In-Situ Air Sparging repsility_Pilot Test <br /> Report dated 04 February 2010, a SVE pilot test was performed. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.