Laserfiche WebLink
r20 December 2005 <br /> • ' AGE-NC Project No 95-0184 <br /> Page 5 of 5 <br /> �1 <br /> 5.0. RECOMMENDATIONS <br /> Based upon data collected from the site a �� <br /> 1 • AGE recommends continued quarterly ground water monitoring with the removal of the full <br /> scan for VOCs},} <br /> • AGE recommend implementation of interim ground water remediation and soil vapor f <br /> extraction Ground water extraction utilizing the current monitoring well network would <br /> Z5,_OS <br /> exert hydraulic control on the water table and extraction of the most severely Impacted <br />' ground water An expected ground water flow rate of only two to three gallons per mmut <br /> per well, should be satisfactory to accommodate a significant mass reduction at the most <br /> severely impacted monitoring/vapor wells , <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon field <br />' measurements and analytical results provided by an Independent laboratory Evaluations of the <br /> hydrogeologic conditions at the site for the purpose of this investigation are made from a limited <br /> number of available data points (i e ground water samples) and subsurface conditions may vary <br /> away from these data points No other warranty,expressed or implied,Is made as to the professional <br /> interpretations, opinions, and recommendations contained in this report <br /> 1 <br /> 1 <br /> 1 <br /> • <br />' Advanced GeoEnvironmental,Inc <br /> 1 t <br />