My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012705
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
ARCHIVED REPORTS_XR0012705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 1:38:54 PM
Creation date
1/17/2020 10:57:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012705
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr, <br /> M- 1 - _ <br /> APPENDIX D <br /> GENERAL FIELD PROCEDURES-MONITORING WELL CONSTRUCTION, <br /> INSTALLATION, AND MONITORING WELL PERMIT <br /> Monitoring_Well Ingt&LLj nn <br /> Ground water monitoring wells were constructed of <br /> 4-inch--diameter, flush-threaded, Schedule 40, PVC blank and <br /> screened (0.020-inch slot size) casing, as shown in the <br /> Boring Logs (Appendix E) „ The casing was installed as the <br /> 10-inch--diameter hollow stem augers were removed. The <br /> annular space surrounding the screened portion of the well <br /> was backfilled with Number 3 Monterey Sand as filter pack to <br /> approximately 2 feet above the top of the screened interval. <br /> A bentonite annular seal was placed above the filter pack, <br /> and the. remaining annulus grouted with concrete to the <br /> surface. Monument boxes were installed above grade to <br /> minimize potential damage to the wells. To minimize <br /> infiltration of surface water and to ensure the integrity of <br /> - the wells, water-tight locking well caps were installed. <br /> ...,. 1:. ... ............. ..._...,..... .........._ ............. .......... ...._..,..__... ............... .._._..._. ... _ .._.. ......_.... _ _ .......... .,.... _..._.._ ......_._ .__..._ __ _._..._ _...._._.. _... <br />
The URL can be used to link to this page
Your browser does not support the video tag.