Laserfiche WebLink
- <br />-�K <br /> ftl.lUr�lakUSU04t h.flit.. <br /> Well Develaprnent end <br /> Y IM%r smptfng Fleld Sutver <br /> J- Date: <br /> Project <br /> Sl1;e: , '�r F. /" s .•.,U r�r 1 <br /> � <br /> We i 1 : _ A% % --- <br /> Sampling Team, <br /> Well Development Method: �— <br /> Sampling Method: - <br /> Describe Equipment Before Sampling This well: <br /> won Davelopmenv wan aw""ng Data <br /> Hater level <br /> Total. well fent Time: � Before Pumping: <br /> Depth: <br /> Volume <br /> Casing oiatieter <br /> hater Eaa= is EM= , <br /> . </. feet x O.l ti <br /> 17 <br /> Depth Purging From! 441_efeet. Time Purging Begins: <br /> . <br /> Notes an Initial oischarge: ^•� <br /> Y� T Note ' <br /> i - I's/ <br /> Time Field Parameter Measurement Begins: <br /> gh e O 1— B-PR-JLZ <br /> Conductivity wA. t- <br /> a. 4a <br /> Temperature IF) <br /> Presample Collection Gallons Purged: <br /> Time Sample Wlectfon Begins: <br /> .' Time Sample C011LCtion Inds: <br /> Total' Gallons purgeds `� <br />