Laserfiche WebLink
Ivl.!U11 li�l771,1�{d4�. 114. <br /> Well Uevelepmenl snd <br /> s Waler SanplIng Field Surrey <br /> Project JL:_1 5i Site: CJD F ;•o ,./nate: Z2 a <br /> Well r Sampling Team.- <br /> Well <br /> eam:Well Development Method: <br /> Sampling Method: <br /> Describe Equipment Before Sampling This Well: — <br /> Total <br /> ell:Total. Well Water level <br /> Depth: feet Time: iI:S�, O�r� Before Pumping: /0 a <br /> Dater Casing Diameter Volume <br /> 2-.t nch J=Jach volume Factor.I LR E11�3/�� <br /> 13 99 Eek 6s <br /> ~ Depth Purging From: /,feet. Time Pur ging Begins: <br /> . Notes on Initial 'Dischaarge: �. h <br /> ILM Yoi= pli Cooductl.vity a Hotel <br /> Time Field Parameter Measurement Begins: <br /> gap #1 fie _ -- - -- <br /> �, <br /> Conductivity <br /> Temperature (F! tog,4In t. <br /> Presample Collection Gallons Purged: w <br /> Time Sample Collection Begins: 511I5r _ <br /> Time Sample C0110ctlon Ends <br /> Toter Gallons purged: <br /> rnmments: <br />