Laserfiche WebLink
1 al <br /> - <br /> RQ--,1t Stress <br /> " Workers will be provided beverages, shaded rest areas, and <br /> breaks, as needod, to prevent heat stress. <br /> � EMERGENCY RESPONSE <br /> i <br /> The Project Safety Officer will have controlling authority <br /> during an emergency. In the event that this person is not <br /> available, the Alternate Safety Officer will be in charge. <br /> Emergency response organizations and contacts are listed at <br /> the end of this plan. <br /> GENERAL SAFETY REQUIREMENTS <br /> F-� The following requirements will also be observed: <br /> s * The Project Safety Officer has the authority to correct <br /> ., unsafe site conditions. All accidents, injuries, and <br /> potentially unsafe working conditions shall be reported <br /> to the Project Safety Officer immediately. <br /> * Eating, smoking, and drinking will be allowed only in <br /> designated offsite areas. Site personnel will wash their <br /> hands and faces thoroughly prior to eating or drinking. <br /> * Respirators will be cleaned, sanitized, inspected, and <br /> maintained by employees after eF-ch use. <br /> Lire extinguishers will be onsite . for use on equipment or <br /> small fires only. <br /> * An adequately stocked first aid kit will be onsite at all <br /> times during work activities. <br /> All practical engineering and geological information, <br /> c:-:perience, and accepted practices will be employed as <br /> necessary to control any and all aspects of site safety while <br /> - carrying out the proposed site remediation work. <br /> A-6 <br />