My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012705
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
ARCHIVED REPORTS_XR0012705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 1:38:54 PM
Creation date
1/17/2020 10:57:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012705
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> + SITE SAFETY PLAN FOR SOIL EXCAVATION <br /> FORMER MOBIL OIL BULK PLANT <br /> 500 EAST GRANTLINE ROAD <br /> TRACY, CALIFORNIA <br /> INTRODUCTION <br /> This plan has been <br /> This <br /> prepared in conformity with the Alton <br /> s Health and Safety program. It addresses those <br /> activities associated with <br /> implemented during excavation activities and will be <br /> L ail onsite work. <br /> Site Safety Pian (SSP) is required Of all <br /> with this <br /> Personnel, subcontractors, and third Alton Geoscience <br /> site. The requirements and parties who enter the <br /> will be subject to modification aastwarraers nted1b1ed in this SSP <br /> conditions or as work progresses. <br /> be made without the However Y existing site <br /> Officer. <br /> Prior approval of the Project changeswill <br /> PROJECT SAFETY OFFICER <br /> The Project Safety Officer has overall responsibility <br /> development, coordination, and implementation of the S <br /> its conformity with the AlL-on Geoscience Health for the <br /> Program.. The Project Safety SP and <br /> for field im lamentation ety Officer will and Safety <br /> P Of the SSP. Thisawillbncludensible <br /> communicating the site-specific requirements to all site <br /> personnel and third parties, and assurng compliance with <br /> Company Health and Safet <br /> i <br /> Project Safet Y Program. In the <br /> Y Officeevent that the the <br /> Officer is unable to perfor <br /> designated Alternate Safety Officer m these duties will be responsible. ' the <br /> SITE PERSONNEL AND THIRD PAIRTIES <br /> All site personnel.-;and third <br /> -. 1 in parties are responsible for <br /> understanding and com <br /> P Y g with all SSPrequirements. <br /> BACKGROUND <br /> Site characLr_rizat.ion drillin <br /> presence o` adsorbed-phase hydxocarbor ;lin the re <br /> soil. <br /> aled the <br /> Hydrocarbo.is present are in <br /> gasoline-rane; both the diesel and <br /> g Ground water occurs at a de <br /> feet below grade. It liar, not depth of 11 to 12 <br /> free,product ,.and dissolved- yet begin determined whether <br /> the ground water. Phase hydrocarbons are present in <br />
The URL can be used to link to this page
Your browser does not support the video tag.