My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012705
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
ARCHIVED REPORTS_XR0012705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 1:38:54 PM
Creation date
1/17/2020 10:57:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012705
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ter+ <br /> w.� <br /> KAPR a A R' l,+r Qp papa Me" . <br /> Consulting Engineers <br /> P-0. Bax 913 <br /> BENICIA,CA 94510 <br /> (415)676.9100 (707) 746-s915 <br /> REI-P88-0810-1 <br /> Mobil Oil CorpOzation December 9, 1988 <br /> P.O. BOX 127 <br /> Richmond, CA 94804 <br /> Attention: Mr. Steve Pao <br /> RE: Preliminary Subsurface Investigation at <br /> Mobil Bulk Plant <br /> 500 East Grantline Road <br /> Trac7 California <br /> Dear Mr. Pao: <br /> This report presents the resultsOf <br /> for the referenced site in our subsurface <br /> September 15, 19Th <br /> 88. accordance with our investigation <br /> assess the e purpose of the proposal dated <br /> quality <br /> location fomonitoring subsurface investigation was to <br /> consisted of the at the site.g wells soil and determine the best. <br /> following: te. <br /> The work performed <br /> Coordination with regulatory agencies. <br /> Drilling six exploratory borings. <br /> Soil sampling. <br /> Laboratory analyses. <br /> Data analyses, .interpretation and report preparation. <br /> PTION P ration. <br /> SITE DESCRI <br /> D BACICGROIJN <br /> f L The subject site <br /> vacant lot was a bulk distribution <br /> as all buildings,- etc: have Plant _:-and is <br /> -vicinity and site <br /> been now- a <br /> description are torn down. Site <br /> No leaks or previous s shown on the attached sketches. <br /> known to fir. ubsurface work performed at the site are <br /> In August 1988r one underground <br /> from the site. Soil samplesfuel storage tank <br /> were analyzed by Se collected from beneath as removed. <br /> hydrocarbon as gasoline <br /> Analytical for the tanks <br /> ethylbenzene ( (TPH) , benzene total petroleum. <br /> lead BTX&E) , ethylene dibromide , toluene, xylenes. and <br /> (TOL) . Samples from beneath the ftie(EDB) and total organic <br /> ranging from 200 to 240 tanks had <br /> contamination found Ppm. Based TPH levels <br /> in the soil from beneath the the Zeveis of <br /> tank, ILEI <br />
The URL can be used to link to this page
Your browser does not support the video tag.