Laserfiche WebLink
s <br /> KEI-P88-0810.WP1 <br /> February 10, 1989 <br /> Page 5 <br /> The main purpose of Phase Il will be to establish a zero line of <br /> ground water contamination. <br /> PHASE III <br /> once the zero line is established through the completion of phase <br /> II, a final remedial plan will be developed. <br /> The first step of phase III will be to conduct aquifer tests as <br /> necessary to define aquifer characteristics. <br /> Interpretations of the subsurface stratigraphy will be used in <br /> consideration of various remedial_ options such as soil excavation <br /> and/or air stripping. <br /> PHASE IV <br /> Implementation of the remediation plan. <br /> Sincerely, <br /> Kaprealian Engineerijzg, Inc. <br /> Gary S. Jo son <br /> Registered Geologist. <br /> License No. 4315 <br /> Exp. Date 6/30/90' <br /> Mardo Kaprealian <br /> President <br /> GSJ:3ad\DH <br /> Attachments: Location Map <br /> Site Plan <br />