My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012705
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
ARCHIVED REPORTS_XR0012705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 1:38:54 PM
Creation date
1/17/2020 10:57:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012705
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
x . <br /> 11�IEri�,3 Uu: 11 U707 i" � ,581 <br /> KAPREAL f AN ENG, <br /> KEI-P88-0810 <br /> September 25, 1988 <br /> Page 2 <br /> 3. Hazardous materials stored at the site include gasoline <br /> and diesel. <br /> 4. Any unauthorized releases atthe site are unknown by <br /> KEI► except as evidenced by elevated TPH in the soil <br /> and benzene in the groundwater beneath the removed 1000 <br /> gallon gasoline tank described above. <br /> II. SITE DESCRIPTION <br /> A. Vicinit Desc tan: The site is on the southern side of <br /> Grand, Road within Tracy City limits. See attached <br /> sketch, <br /> B. Sae attached Location plan for site vicinity description. <br /> C. A 8__,' One 1000 <br /> gallon gasoline tank. <br /> D• See attached site plan for site <br /> details. Borehole <br /> will be decided during drilling. locations <br /> IxI. F1'ELD WORK <br /> A. )ri.Zl <br /> 1• TYPO Of Drilling - hollow stem continuous. flight auger, <br /> 8" diameter. - <br /> 2. Depth of Boreholes: 13 to 15 feet <br /> Groundwater is anticipated at approximately <br /> below grade. Boreholes Will be 12.5 feet <br /> approximately1 foot below first drilled to <br /> water samples can be collected, groundwater so that <br /> • <br /> 2. <br /> Drilling is-_tentatively planned -far week of the thizii - - - <br /> - September 1988. ' . <br /> 4. Soil samples will Be collected at <br /> beginning at a depth of s feet and �r 11 continu`ive foot tervals l <br /> until <br /> the first water table is encountered. Classification [ <br /> of soil will be done using the Unified soils <br /> Classification System (USCS) by KEI's field engineer or <br /> geologist. <br />
The URL can be used to link to this page
Your browser does not support the video tag.