Laserfiche WebLink
a <br /> 2 <br /> a_ <br /> wag z <br /> y <br /> KEI-.786-031 <br /> September 8, 1986 <br /> TABLE 1 <br /> Remedial Measure Activities <br /> Mobil Oil Corp. - Tracy Balk Plant <br /> Act�v <br /> Date Started <br /> Coordination with regulatory agencies <br /> 2/27/86 <br /> Site Visit <br /> 3/27/86 <br /> Contaminated soil removal; soil sampling; <br /> contaminated water removal. <br /> 4/14/86 <br /> Well E-2 monitoring and sampling. <br /> 6/17/86 <br /> 550 gallons underground tank removal; . <br /> soil sampling for chemical analyses. <br /> 6/24/86 <br /> Insta?'-ation of curb around the loading service <br /> area and backfilling with clean pea gravel. <br /> 8/22/86 <br /> 5 <br />