Laserfiche WebLink
K� <br /> KEI-386-031 <br /> September 8, 1986 <br /> TABLE 1 <br /> Remedial Measure Activities <br /> Mobil Oil Corp. - Tracy Bulk Plant <br /> Activit�r <br /> Date Started <br /> Coordination with regulatory agencies 2/27/85 <br /> Site Visit <br /> 3/27/86 <br /> Contaminated soil removal; soil sampling; <br /> contaminated water removal. <br /> 4/14/86:; <br /> Well E-2 Monitoring and sampling. 6/17/85 <br /> 550 gallons underground tank removal; <br /> soil sampling for chemical analyses. 6/24/86 <br /> Installation of curb around the loading service <br /> area and backfilling with -clean pea gravel. 8/22/86 <br /> 5 <br />