My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011571
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
ARCHIVED REPORTS_XR0011571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 1:13:31 PM
Creation date
1/17/2020 11:28:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011571
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOIL SAMPLE HANDLING <br /> Soil sample handling follows the same bask protocol for both drilling and excavation activities. <br /> Upon retrieval, soil samples are immediately removed from the sampler, sealed with Teflon <br /> sheeting and polyurethane caps, and wrapped with tape. Each sample is labeled with the project <br /> number, boring/well number, sample depth, geologist's initials, and date of collection. After <br /> the samples have been labeled and documented in the chain of custody record, they are placed <br /> in a cooler with ice at approximately 4 degrees Celsius (°C) prior to and during transport to a <br /> state-certified laboratory for analysis. Samples not selected for immediate analysis may be <br /> transported in a cooler with ice and archived in a frostless refrigerator at approximately 4°C for <br /> possible future testing. <br /> MONITORING WELL INSTALLATION <br /> Monitoring wells are constructed of 4-inch-diameter, flush-threaded Schedule 40 PVC blank and <br /> screened (0.010-inch slot size) casing. The screened interval will typically extend at least 5 feet <br /> above, and 10 to 20 feet below, the top of the ground water table. The annular space <br /> surrounding the screened casing is backfilled with No. 2/16 Monterey sand (filter pack) to <br /> approximately 2 feet above the top of the screened section. <br /> During well construction, the filter pack is completed by surging with a rig-mounted surge <br /> block. A bentonite annular seal is placed above the filter pack. The remaining annular space <br /> is grouted with neat cement and/or bentonite grout to the surface. Utility access boxes are <br /> installed slightly above grade. Locking, watertight caps are installed to prevent unauthorized <br /> access to the well, and limit infiltration of surface fluids. <br /> FLUID LEVEL MONITORING <br /> Fluid levels are monitored in the wells using an electronic interface probe with conductance <br /> sensors. The presence of liquid-phase hydrocarbons is verified using a hydrocarbon-reactive <br /> paste. The depth to liquid-phase hydrocarbons and water is measured relative to the well box <br /> top or top of casing. Well box or casing elevations are surveyed to within 0.02 foot relative to <br /> a county or city bench mark. <br /> GROUND WATER PURGING AND SAMPLING <br /> Ground water monitoring wells are purged and sampled in accordance with standard regulatory <br /> protocol. Typically, monitoring wells that contain no liquid-phase hydrocarbons are purged of <br /> ground water prior to sampling so that fluids sampled are representative of fluids within the <br /> formation. Temperature, pH, and specific conductance are typically measured after each well <br /> rasing volume has been removed. Purging is considered complete when these parameters vary <br /> less than 10% from the previous readings, or when three casing volumes of fluid have been <br /> removed. Samples are collected without further purging if the well does not recharge within <br /> 2 hours to 80% of its volume before purging. <br /> GENFLD.1:6r17/93 A-2 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.