Laserfiche WebLink
y. MOBIL UNIT COST FIELD FORA <br /> •�•►M GROUND WATER MONITORING AND SAMPLING <br /> PROJECT NUMBER (-t Z(O ACTON PERSONNEL f <br /> STATION NUMBER b — DATE . l <br /> xm� <br /> WEATHER OAY <br /> l <br /> i HOURS <br /> Hours spent travelling to and from site (return): f. <br /> Hours spent on site: , <br /> E Number of mob/demobs to and from site: <br /> i <br /> MILEAGE <br /> i, Roundtrip mileage from Alton's offlce to site (1 man): s6 <br /> Roundtrip mileage from Afton's office to site 12 man): <br /> WELLS MONITORED AND SAMPLED <br /> Number of wells monitored but not sampled: <br /> Number of wells monitored and sampled (depth to water < 25 feet): <br /> Number of wells monitored and sampled (depth to water 26 to 85 feet): <br /> Number of wells monitored and sampled (depth to water > 85 feet): <br /> DRUM INVENTORY <br /> Number of drums of Around water disposed into onsite ARS: <br /> Number of drums onsite(water): <br /> TRAFFIC CONTROL <br /> Number of days for major street traffk control: <br /> Number of days for non-msJor street traffic control. <br /> Cost for Caltrans lane closure: <br /> FREE PRODUCT PUMP-0VTS <br /> Free product pump-out discipline travel (cap of 200 miles): <br /> Number of free product pump-out equipment mobldemobs: <br /> Number of webs (manual pump-outs): <br /> FIELD NOTES: <br /> 14 F- <br /> 1 <br />