My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2300 - Underground Storage Tank Program
>
PR0232261
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 12:59:58 PM
Creation date
1/17/2020 11:57:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232261
PE
2361
FACILITY_ID
FA0002590
FACILITY_NAME
THORNTON 76
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> V E D <br /> UST SYSTEM RETROFIT OR REPAIR <br /> lffMENT <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by H " <br /> 1 . Site map enclosed? YES [ ] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component, describe how this will be done. ( If <br /> adding piping , UDC's , or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Remove existing dispensers, install 1 and 1 E85 dispenser <br /> Install Bravo conversion frames <br /> Possible cold start <br /> Convert 89 tank to E85 <br /> Install E85 overfill valve -VMI E85 leak detector <br /> Install New Sump Sensor <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval) : <br /> 2) Gilbarco 700S <br /> 2) Bravo conversion frames <br /> 1 ) OPW E85 overfill valve 71SOM412C <br /> 1 ) VMI 99 LD2000 <br /> 1 ) Veeder-Root 794380-323 Position Sensitive Pan Sump Sensor <br /> EH230038 (revised 12-11 -15) 3 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.