Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 1 of 6yil�-' <br /> Type of Action N Installation Test ❑ Repair Test N Six Month Test <br /> ❑36 Month Test <br /> I. FACILITY INFORMATION EENVIRONMENlitc , <br /> CERS ID Date of SecondaPgRARTMPT <br /> 10184539 07/15/2020 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Chevron 210997 <br /> Business Site Address City ZIP Code <br /> 1442 W. Colony Rd I Ripon 1 95366 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the/CC Certification.) FP-hon-e# <br /> Nick Harvey (916)834 - 5099 Ext. <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 300345 A B C61/D40 HAZ 5115738 01/11/2021 <br /> III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br /> Tank ID:(By tank number,stored product,etc.) A 87 B 91 C D <br /> Tank Containment <br /> Tightness Test Result ❑Pass ❑Fail E NA ❑Pass ❑ Fail N NA ❑Pass ❑Fail ❑ NA ❑ Pass ❑ Fail ❑NA <br /> Product Piping Containment <br /> Tightness Test Result E Pass ❑ Fail ❑ NA E Pass ❑ Fail ❑ NA ❑Pass ❑Fail ❑ NA ❑ Pass ❑Fail ❑ NA <br /> Communication Test Result E Pass ❑ Fail ❑ NA E Pass ❑ Fail ❑NA ❑ Pass ❑Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Remote Fill Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail E NA ❑ Pass ❑ Fail E NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail E NA ❑ Pass ❑ Fail E NA ❑ Pass ❑ Fail ❑ NA ❑Pass ❑ Fail ❑ NA <br /> Vent Piping Containment <br /> Tightness Test Result ❑ Pass ❑Fail E NA ❑ Pass ❑ Fail N NA ❑ Pass ❑ Fail ❑ NA ❑Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑Fail N NA ❑ Pass ❑ Fail E NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Vapor Recovery Piping Containment <br /> Tightness Test Result N Pass ❑Fail ❑ NA N Pass ❑ Fail ❑NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑NA <br /> Communication Test Result N Pass ❑Fail ❑ NA N Pass ❑ Fail ❑ NA ❑ Pass ❑Fail ❑ NA ❑ Pass ❑ Fail ❑NA <br /> Turbine/Product Piping Sump <br /> Tightness Test Result E Pass ❑Fail ❑ NA N Pass ❑ Fail ❑ NA ❑Pass ❑Fail ❑ NA ❑ Pass ❑ Fail ❑NA <br /> Fill Riser Sump <br /> Tightness Test Result E Pass ❑Fail ❑ NA N Pass ❑ Fail ❑NA ❑Pass ❑Fail ❑ NA ❑ Pass ❑ Fail ❑NA <br /> Vent/Transition Sump ID: a b C d <br /> Tightness Test Result ❑ Pass ❑Fail ❑ NA ❑ Pass ❑ Fail ❑NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> UDC ID: 1 1/2 23/4 3 5/6 4 7/8 <br /> Tightness Test Result N Pass ❑Fail ❑ NA N Pass ❑ Fail ❑NA N Pass ❑ Fail ❑ NA N Pass ❑ Fail ❑ NA <br /> UDC ID: 59/10 6 11/12 7 8 <br /> Tightness Test Result N Pass ❑Fail ❑ NA N Pass ❑ Fail ❑NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> UDC ID: 9 10 11 12 <br /> Tightness Test Result ❑ Pass ❑Fail ❑ NA ❑ Pass ❑ Fail ❑NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑Fail ❑ NA <br /> All items marked"Fail"or"N/A"must be explained in their respective"COMMENTS"section. <br /> IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the secondary containment was tested in accordance with California Code of Regulations,title 23, <br /> division 3,chapter 16,section 2637 and all the information contained herein is accurate. <br /> UST Service Technician Signature l u A r t <br /> U 11�,�'{ <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground storage tank,ICC=International Code Council, <br /> NA=Not applicable,UDC=Under-dispenser containment <br />