Laserfiche WebLink
Page 1 of 1 <br /> 210997 <br /> 1. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: 4"Oil filled Gauge Equipment Resolution: 0 <br /> TE87 Product 91 Product Vapor Return <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Aprox 200' Aprox 200' Aprox 200' <br /> Product Stored: 87 Gas 91 Gas Vapor Return <br /> Method and location of Boots Boots Boots <br /> piping-run isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: _ <br /> Test Start Time: 9:09am 9:09am 9:09am <br /> Initial Reading(RI): 5 psi 5 psi 5 psi <br /> Test End Time. 10:09am 10:09am 10:09am <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail I ® Pass ❑ Fail ® Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />