Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of s) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment <br /> if installed. 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Aloaitodn8 Slte Plan_. _- _ ._ - _- _- <br /> I. Site Address: <br /> ___ I QUICK SHOP ,2072 W YOSEMITE AVE MANTECA CA 85337 <br /> - <br /> _ 4 <br /> 10. <br /> . . . . . . . . - VI€NT3. <br /> . ..100 DIESEL . w . : : . . - .. . . - - .. _ .1000 <br /> r 1 OOO <br /> 17 O .87 SPHYON <br /> (ARROWS) <br /> DIA1iII= ofplping <br /> exit of sump and <br /> UDC'&. \o . . . <br /> underLaound <br /> dMilrin2a i3 <br /> 1CCnlite, Ure . . . . . . <br /> cannot specidate <br /> . . . . . . . . . <br /> blue prints. <br /> : o <br /> - . . 91 . <br /> KEY - - - . . <br /> A =XNTJLR . . . . . . - . . . . . . . . . . <br /> F = FIMS <br /> T = TURBINE etc <br /> P = PROBE <br /> Y = VAPOR - <br /> X= SIAIP SUIS OR .8 : s . 5. ,�. .. 2. . .1 . .-y I a - STOP <br /> L = Leak Detector <br /> Xf=Afamcsf' <br /> B = Brine Senior <br /> I = Smart Sensor . . . . . . . . - <br /> S = 5TP <br /> C =Floats & Chaim <br /> E = EStop - . <br /> f MWORTIVAY <br /> Date map visa drawn[ 2017 <br /> Instruciw <br /> If you already have a diagram that shows a required itfor ration, you may include it, rather than this pate, with your Monitoring System Ceitfoatwn. On your si . plan, <br /> show the general layout of tanks and piping. Clearly identity bcafons of the following equipment, I installed: mon boring system control panels; sensors monitoring tank <br /> annular spaces, s umps , dispenser pans, spill containers, or other secondary centaament areas: mecha nical or etectronic line leak detac ors; and in tank liquid level <br /> probes (d used for leak detecton). In the spare provided, note the dal this Site Ran was prepared. <br /> LEGEND <br /> R E <br /> 1 [[ <br /> OCT 14A 2020 <br /> LCL <br /> DEPART VENT <br />