Laserfiche WebLink
APPENDIX A <br /> GENERAL FIELD PROCEDURES <br /> A description of the general field procedures used during site investigation and monitoring <br /> activities is presented below. For an overview of protocol, refer to the appropriate section(s). <br /> DRILLING AND SOIL. SAMPLING <br /> Soil borings are drilled using continuous-flight, hollow-stem augers. Borings that are not <br /> completed as monitoring wells are grouted to within 5 feet of the ground surface with a <br /> cemenUbentonite slurry. The remaining 5 feet is filled with concrete. <br /> Soil samples are obtained for soil description, field hydrocarbon vapor screening, and possible <br /> laboratory analysis. Soil samples are retrieved from the borings by one of two methods: <br /> 1) continuously, using a 5-foot-long, continuous-core barrel sampler advanced into the soil with <br /> the lead auger; sample tubes are driven into the core with a mallet, or 2) at 2.5- or 5-foot <br /> intervals, using a standard split-spoon sampler lined with four 1.5-inch-diameter stainless steel <br /> or brass sample inserts. The split-spoon sampler is driven approximately 18 inches beyond the <br /> lead auger with a 140-pound hammer dropped from a height of 30 inches. <br /> For hand auger borings and hand-held, power-driven auger borings, soil samples are retrieved <br /> using a hand-driven slide hammer lined with a 1.5-inch-diameter stainless steel sample tube. <br /> During drilling activities, soil adjacent to the laboratory sample is screened for combustible <br /> vapors using a combustible gas indicator (CGI) or equivalent field instrument. For each <br /> hydrocarbon vapor screening event, a 6-inch-long by 2.5-inch-diameter sample insert is filled <br /> approximately 1/3 full with the soil sample, capped at both ends, and shaken. The probe is then <br /> inserted through a small opening in the cap, and a reading is taken after approximately <br /> 15 seconds and recorded on the boring log. The remaining soil recovered is removed from the <br /> sample insert or sampler, and described in accordance with the Unified Soil Classification <br /> System. For each sampling interval, field estimates of soil type, density/consistency, moisture, <br /> color, and grading are recorded on the boring logs. <br /> EXCAVATION SOIL SAMPIJNG <br /> Excavation soil samples are collected either by driving a stainless steel sample tube directly into <br /> freshly uncovered soil, or from the backhoe bucket by driving the sample tube into a relatively <br /> coherent and undisturbed portion of soil within the bucket. Excavated soil is temporarily <br /> stockpiled onsite. Stockpile samples are collected by shoveling below the surface of the pile and <br /> inserting a steel sample tube into the soil. <br />