Laserfiche WebLink
SEP-22-1995 10:29 GEOMATRIX FRESNO 209 264 ?431 P.16f1? <br /> Sgeaial Condition for Encroachment Perini.t No. 95-192 <br /> The Permittee should coordinate the schedule of work with Construction <br /> Management (Paul verma) .The work to be done under this permit shall <br /> not interfere with the Grantline Road project. <br /> • The Permittee should maintain o proper traffic control as per GALTRANS <br /> Traffic Manual. <br /> • It is Permittee's responsbility to verify any conflict with the pubfic utilities, in <br /> case of conflict the well location should be moved. <br /> • After taking sail samples,the borings should be grouted with bentonite_ <br /> cement mixture and patched with asphalt properly compacted. <br /> ■ The Permittee is responsible for any damage to public or private properly <br /> as a result of this permit. <br /> �118�9S" <br />