Laserfiche WebLink
ARCAUIS Ms. Kristi Shelton <br /> August 16, 2010 <br /> remainder of each borehole was backfilled to the surface with native soil to <br /> I'I accommodate the road improvement project. <br /> All project-derived wastes were contained in Department of Transportation (DOT)- <br /> approved, 55-gallon, steel drums. The drums were stored on-site temporally pending <br /> proper disposal. The drums were removed on July 29, 2010, and transported to the <br /> Altamont Landfill in Livermore, California, for disposal. <br />{ If you have any questions regarding the well destruction activities, please contact me <br /> at 714.730.9052 Ext 13. <br /> Sincerely, <br /> j ARCADIS U.S., Inc. <br /> Dana P. Koschel <br /> Sr. Project Scientist 11/CPM <br /> Attachments <br /> Figure 1 - Site Plan <br /> Well Destruction Permit <br /> Copies: <br /> John MacLeod, Chevron EMC,San Ramon, CA <br /> Mike Infurna;San Joaquin County Environmental;Health Department, Stockton,:CA, <br /> Dr. Benjamin Spindler, Delta Blood Bank, Stockton, CA <br /> c <br /> I <br /> i <br /> i <br /> I <br /> Page: <br /> g:\common\allen\chevron o&m\corral hollovAwell destruction\well destruction_08.16.10.doc 2/2 <br /> 1 <br />