Laserfiche WebLink
i <br /> f <br /> i <br /> Geological Technics Inc. Page 3 <br /> Former Moresco Property I <br /> Site Characterization Work Plan i <br /> Project No.251.2 <br /> March 14,1995 <br /> Chain of Custody will be completedfor all samples collected and tracked to ensure <br /> sample integrity. <br /> Detection Limits: BTEX Total Lead TPH-Gasoline <br /> Soil (µg/Kg) 3.0 5,000 1,000 i <br /> 3.0 SCHEDULE & REPORTING <br /> . h <br /> Geological Technics Inc. anticipates beginning field work no later than 30 days after <br /> work plan approval and upon issuance of the;drilling permit. The information <br /> gathered during this phase of work will be`presented in a report which will include <br /> a summary of the geology as well as the results of sample analyses. The project will <br /> be supervised by Dr. Ray Kablanow; a registered professional geologist.- Copies of <br /> � <br /> the report will be forwarded to both the.appropriate County and Stateregulatory ' <br /> agencies (SJC-PHS-EHD and CRWQCB). <br /> i <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by ;Geological Technics Inc. .in accordance with <br /> accepted geologic and hydrologic standards of the State of California accepted and <br /> in effect at the time of this investigation. Geological Technics Inc. is not responsible <br /> for undisclosed conditions.. <br /> This work plan was prepareby. <br /> b <br /> Timothy J. McDonald Y <br /> Geologist ESS10��c <br /> F0 <br /> R.I.UJ Ln <br /> KA8l.4t�OW 11 r� <br /> No.5234 <br /> Raynold I. Kablanow'II, Ph.D. <br /> California Registered Geologist#5234 �fgTf �r'�P <br /> Registered Environmental Assessor#901 OF CAUL <br /> L <br />