Laserfiche WebLink
TABLE OF CONTENTS <br /> 1.0 INTRODUCTION <br /> 2.0 INTERIM REMEDIAL ACTION <br /> 2.1 Proposed Extraction Wells <br /> 2.2 Proposed Recharge Wells <br /> 2.3 Pipe Connections <br /> 2.4 Blower <br /> 2.5' EmissionsTreatment System <br /> 2.6 Installation <br /> 2.7 Operation <br /> 3.0 ASSESSMENT OF REMEDIAL.EFFECTIVENESS <br /> 3.1 Radial Influence Test <br /> 3.2 Removal Volume <br /> 4.0 SCHEDULE & REPORTING <br /> 5.0 SIGNATURE AND CERTIFICATION <br /> I � <br /> LIST OF FIGURES <br /> Vicinity Map 1 <br /> k Site Map 2 <br /> Schematic of Vapor Extraction System 3 <br /> + Schematic of Vapor Extraction Well 4 <br /> t <br /> LIST OF APPENDICES <br />' Health and Safety/Quality Assurance Program A <br /> f Thermal Oxidizer Specification B <br />� r <br />