Laserfiche WebLink
ij <br /> JAN-28-1100 04:38 FROM GEOLOGICAL TECFNICS TO 4640138 P.01 <br /> �,4 s <br /> GeologicalTechnics !Inc-. <br /> 2749 9W <br /> �todestn,c ;�� t <br /> ao9�ls-6�ZK -55� <br /> Meme <br /> To. Mike IVICGraaahan IN <br /> u <br /> From: Ra Kat'` <br /> Ray 'l APR � �:•�.� <br /> Pmjc!ct Name: McGmahan(Gawne Road �9V 7 1997 <br /> Project 4: 2512 <br /> s�bi ►;�ctstatus �E� rr/SCRV/ ��LrH <br /> Es <br /> M Ron Rowe <br /> Date= 414M <br /> Rom Rowe (STCPHSEHD) has given verbal approval of the work plan for modeling and will <br /> send a caret#fin approval soon.. <br /> We are in the process of d"cloping a cost pre-approval for the risk modeling wort:and will send <br /> it to you next week for signature. After you leave signed it,submit it to the USTCFP. <br /> The bank and the land owner have contacted me to discuss the status and future of thisrn'ect <br /> P ] <br /> and the possibility of performing an engineered remediation, A lot hinges on the RWQCB <br /> interpretation of the models results and if they will require a cleanup. <br /> IIS <br /> a <br /> TOTAL P.Oi <br /> t <br />