My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
385
>
2900 - Site Mitigation Program
>
PR0508441
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 1:14:17 PM
Creation date
1/22/2020 1:02:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508441
PE
2950
FACILITY_ID
FA0008077
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #266
STREET_NUMBER
385
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449012
CURRENT_STATUS
01
SITE_LOCATION
385 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W IN ZL.ER(Sg_KE1 LY <br /> C 9 N S V L T f N G E N G N E E R 5 <br /> Ms. Margaret Lagorio, REHS <br /> January 16, 2004 <br /> Page 3 <br /> Soil samples will be collected from the boring/well in accordance with the attached Site-Specific <br /> Monitoring Well Installation Procedures (Appendix Q. Two soil samples will be obtained for <br /> chemical analyses. One soil sample will be collected above the soil water interface. <br /> w.. <br /> Sampling equipment will be thoroughly cleaned between sampling intervals to avoid cross- <br /> contamination of the soil samples. The soil cuttings generated from the drilling activities, <br /> decontamination rinsate, and purge water will be collected in 55-gallon drums and secured with <br /> lids. The drums will be labeled and stored on site. Soil analytical results from the borings will be <br /> used to profile the drill cuttings for proper disposal. <br /> Soil samples will be analyzed for TPH-G using EPA Test Method 8015M, and for BTEX, <br /> MTBE, TBA, DIPE,ETBE, and TAME by EPA Test Method 8260B. Samples will be submitted <br /> under chain-of-custody procedure to a California-certified laboratory for analyses. All of the <br /> chemical analyses will be performed on a standard, non-rush turn-around basis. <br /> The new monitoring well, MW-4,will be developed and sampled no sooner than 48 hours after <br /> construction to ensure that the grout has completely set. The monitoring well will be developed <br /> in accordance with the attached Site-Specific Monitoring Well Development Procedures <br /> (Appendix Q. Monitoring well MW-4 will be surveyed relative to the three existing monitoring <br /> wells. n,� ,.�. <br /> L' <br /> Tasks 3 and 5—Semi-Annual Monitoring Well Sampling <br /> The three existing monitoring wells (MW-1, MW-2 and MW-3)will be sampled at the same time <br /> as the new monitoring well MW-4. Depth-to-groundwater measurements will be measured in all <br /> of the monitoring wells and groundwater samples will be collected in accordance with the Site- <br /> Specific Groundwater Sampling Procedures (Appendix Q. <br /> Groundwater samples will be analyzed for TPH-G using EPA Test Method 8015M, and for <br /> BTEX, MTBE, TBA, DIPE, ETBE, and TAME by EPA Test Method 8260. Samples will be <br /> �. submitted under chain-of-custody procedure to a California-certified laboratory for analyses. All <br /> of the chemical analyses will be performed on a standard,non-rush turn-around basis. <br /> �. Task 4—Investigative Report <br /> After receipt of all the laboratory data, Winzler&Kelly will prepare an Investigative Report to <br /> document the findings. The report will summarize the investigation procedural details and site <br /> �.. observations The Investigative Report will include the following: <br /> LW <br /> L.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.