Page 1 of 2 <br /> Mike Infurna [EH] <br /> From: Mike Infuma [EH] <br /> Sent: Friday, August 04, 2006 11:00 AM <br /> To: 'Joseph Dies' <br /> Subject: RE: Mariposa Lkaes MWs <br /> Joe, <br /> I'll have the permit for MWs 10 thru 12 and the 6 geotech borings issued by end of <br /> today, Friday, Aug 4. <br /> I'll be out of the office Monday, Aug 7 thru, and including Aug 9. I'll be back in the <br /> office Thurs, Aug 10 at 8am. <br /> I spoke with Karli at V&W. I ok'd start date Aug 10 for —7-days (her schedule, not <br /> mine). <br /> You'll be ok to start Thurs Aug 10. <br /> I'll be onsite around 9am to deliver the permit to you and V&W. In an attempt to save <br /> your RP some $$$$ and allow me to conduct the other grout inspections I have that <br /> week, I'll be interested in how your drilling/grouting will proceed. <br /> Assuming you plan on TWO holes per day and unless you leave the augers in the hole, <br /> that could mean two inspections- one in the am for the first hole, then later in the pm <br /> for the second hole. And if you plan on three or more hole per day, without multiple sets <br /> of augers (to leave in each hole), I could be out there many times in one day. <br /> I reviewed my field notes for the first set of wells. Typical grout inspection times show <br /> me onsite, as an example, for MW-8 at 2pm and left at 330pm. 1.5 hours grout PLUS <br /> drive time. MW-8 was 92' TO and the grout was 73 feet. I charged the site 2.2 hours <br /> for this on Feb 15. Other wells were typically the same if not slightly lower in time. <br /> If you consolidate the grout inspection down to one a day, you could save on my drive <br /> time. Grout times should be close to the same. As a suggestion, if you drill TWO wells, <br /> then you'll could plan on leaving —70-feet of augers in the first hole, then drill the <br /> second one. Call me out for the second well grout, then when done, we go to the first <br /> well and grout it. One trip, two grouts. <br /> This will require the drillers to bring out enough augers. If not possible, then plan on <br /> 8/4/2006 <br />