Laserfiche WebLink
20 January 2015 • • <br /> AGE Project No. 15-3317 <br /> Page 4 of 4 <br /> concrete. The EHD will be notified for grout inspection at least 48 hours prior to <br /> conducting grouting procedures. <br /> 3.2. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br /> All sampling tools used for sample collection, except for disposable bailers, will be <br /> thoroughly rinsed with clean water after being washed with a solution of Alconox. All <br /> down-hole drilling equipment will be washed prior to starting each boring. Cuttings <br /> generated during drilling and rinseate generated during drilling will be containerized in <br /> properly labeled DOT-approved 55-gallon drums, and stored on-site in an area lacking <br /> public access. Disposal alternatives will be evaluated based on results of soil and water <br /> analysis. <br /> Advanced CeoEnvironmental,Inc. <br />