Laserfiche WebLink
SECOR www. secor_com <br /> b INTERNATIONAL 3475 West Shaw Avenue, Suite 104 <br /> S E C O R INCORPORATED Fresno, CA 93711 <br /> i 559-271 -2650 TEL <br /> - <br /> i 559-2715108 Fm <br /> January 13 , 2005 "S CIS <br /> . I <br /> Ms . Devra Lewis <br /> California Regional Water Quality Control Board - <br /> Central Valley Region <br /> 11020 Sun Center Drive, Suite 200 <br /> Rancho Cordova , California 95670 <br /> RE : 2005 ChevronTexaco Pipeline Assessment Report <br /> ChevronTexaco Bay Area Product Line ( MP 9 . 90) 30-2792 <br /> Adjacent to 541 West Grant Line Road <br /> Tracy, California <br /> SECOR Project No. : 77CH .32792.01 . 0170 <br /> Dear Ms. Lewis : <br /> SECOR International Incorporated (SECOR), on behalf of ChevronTexaco Environmental <br /> Management Company (CEMC) , has prepared this report to present the results of <br /> ChevronTexaco Bay Area Product Line (BAPL) assessment activities at mile-post (MP) <br /> 9. 90, adjacent to 541 West Grant Line Road , in Tracy, California (Figure 1 ). The purpose of <br /> this investigation was to further characterize a section of the BAPL located adjacent to 541 <br /> West Grant Line Road, Tracy, California . This report was prepared in accordance with <br /> SECOR's 2004 Chevron Pipeline Characterization Work Plan, dated August 31 , 2004, and <br /> the-requirements-outlined-within-the- letter-from-the-California-Regional-Water-Quality - <br /> Control Board (RWQCB) , dated September 3 , 2004 . The submittal of this report was <br /> j extended from October 29 , 2004 , to January 14, 2005 , as indicated in the email <br /> correspondence between David Evans of SECOR and Devra Lewis of the RWQCB , dated <br /> November 12 , 2004. Regulatory correspondence is included in Attachment 1 , <br /> SITE DESCRIPTION <br /> The site is a section of the ChevronTexaco BAPL, MP 9. 90 , located near 541 West Grant <br /> Line Road in Tracy, California. The surrounding area consists of commercial <br /> buildings/businesses and residential lots . An unlined storm water basin lies near the center <br /> of the property located at 541 West Grant Line Road . The BAPL is approximately 45 feet <br /> south of the site and runs underground down the approximate centerline of West Grant Line <br /> Road (Figure 2). The BAPL has actively transported refined fuel since 1965. <br /> I :\Chevron\302792\Reports\Chevron Pipeline Assessment Report RevA.doc <br />