Laserfiche WebLink
Work Plan for Soil and Groundwater Assessment 3 <br /> Chevron U.S.A. Products Company, 575 West Grantline Road, Tracy, CA February 14 , 1995 <br /> water is visibly clear. Development water will be stored in a DOT-approved purge water trailer and <br /> hauled to a Chevron refinery for recycling. <br /> Top of casing (TOC) and horizontal position of the wells will be professionally surveyed relative to an <br /> established local bench mark. <br /> TASK 4: REPORT PREPARATION <br /> Groundwater Technology will prepare a report summarizing the data collected under the scope of <br /> work detailed above. The report will document the methods and results of the work, summarize <br /> laboratory analytical results, and include appropriate maps. <br /> Please contact our West Sacramento office at 916-372-4700 if you have questions or comments <br /> about this work plan. <br /> Sincerely, <br /> Groundwater Technology, Inc. Groundwater Technology, Inc. <br /> Submitted by: Approved by: <br /> i <br /> VPoject <br /> M. Fedota E. K. Simonis, R. G . <br /> eologist Senior Geologist <br /> Manager <br /> lED) !( s c a <br /> i <br /> Attachments p <br /> 1 . Figures p z <br /> No. 4422 C <br /> 9T� 0F' L',AI <br /> 81385GA.WKP <br /> ❑❑W GROUNDWATER <br /> ❑❑❑ TECHNOLOGY . <br />