Laserfiche WebLink
• A20 Lump Sum Final Water Quality Testing <br /> dollars $ $ <br /> and cents per lump sum <br /> i <br /> A21 Lump Sum Flowmeter Survey <br /> dollars $ $ <br /> and cents per lump sum <br /> A22 4 Samples Depth Specific Samples <br /> dollars $ $ <br /> and cents per sample <br /> A23 Lump Sum Plumbness &Alignment Tests <br /> dollars $ $ <br /> and cents per lump sum <br /> A24 Lump Sum Television Well Survey <br /> dollars $ $ <br /> and cents per lump sum <br /> A25 Lump Sum Well Disinfection &Well Capping <br /> dollars $ $ <br /> . and cents per lump sum <br /> A26 Lump Sum Clean-up During Construction & Final <br /> dollars $ $ <br /> j and cents per lump sum <br /> A27 24 Hours Standby Time <br /> dollars $ $ <br /> and cents per hour <br /> Total Bid Price Schedule A Ball Park Well at $ <br /> Dollars <br /> and cents <br /> 1 <br /> i <br /> August 2001 Division 1V-8 Bali Park& Park& Ride Wells Ph 1 <br />