My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081371 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KLO
>
228
>
2600 - Land Use Program
>
SR0081371 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 10:25:33 AM
Creation date
1/23/2020 10:14:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081371
PE
2602
STREET_NUMBER
228
STREET_NAME
KLO
City
LATHROP
Zip
95330
APN
19124018
ENTERED_DATE
11/5/2019 12:00:00 AM
SITE_LOCATION
228 KLO
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 October 2019 AdvancedGeo <br /> AGE Project No. 19-4881 E n v i ro n m e n t a I <br /> Page 13 of 15 .n. <br /> more sands and faster percolation rates (less moisture and clay content) denitrify only <br /> about 10 percent. <br /> A denitrification factor of 25 percent was selected for the calculation based on the fine <br /> sandy loam soil existing at the site. <br /> 9.6. MASS BALANCE OF NITROGEN LOADING <br /> The EHD requires the user to consider all potential sources identified for wastewater <br /> generation. Further, the EHD supports the use of Hantzsche/Finnemore, or other <br /> appropriate formula/model to calculate a mass of nitrogen loading. <br /> RESIDENTIAL: <br /> The Hantzsche / Finnemore (Nr) equation for residential home application: <br /> Nr = IxNw (1-d) + RxNb = (I+R) <br /> Definitions: <br /> Nr= The average concentration of nitrate-nitrogen in the recharged waste water parts per <br /> million of nitrate-nitrogen. <br /> I = Volume rate of wastewater entering the soil averaged over the gross developed area <br /> (acres) in inches per year. The total wastewater volume for proposed project will be <br /> 280 gpd (existing system) +280 gpd (proposed system) x 365 days of proposed operation <br /> _ (280 + 280) x 365 days - 7.48 gallons per cubic foot = 27,326 cubic feet of wastewater. <br /> Does not account for evapotranspiration likely to occur. <br /> NW = Total nitrogen concentration of wastewater at 45 mg/L-N based on the average <br /> discharge. Accounting for the loss of mg/L-N in the septic tank at 15% = 45-15%= 38.25 <br /> and the loss from the biomat at 10% 38.25 - 10% = 34.425 mg/L-N <br /> d = Fraction of nitrogen concentration removed from the wastewater due to denitrification <br /> within the soil (25 percent for sandy loam soils). <br /> R = Estimated Deep percolation / average rainfall recharge rate per year: 3.64 inches. <br /> Nb = Background nitrate-nitrogen concentration of rainfall recharge: 1.0 mg/I. The Nb is <br /> an average value determined for San Joaquin County by the EHD. <br /> EXISTING HOME AND PROPOSED HOME CALCULATIONS (COMBINED): <br /> Nr = IxNw (1-d)+ RxNb _ (I+R) <br />
The URL can be used to link to this page
Your browser does not support the video tag.