Laserfiche WebLink
l.l. <br /> UNDERGROUND STORAGE TANK UNAUTHORIZED RELEASE(LEAK)/CONTAMINATION SITE REPORT <br /> EMERGENC1f HAS STATE OFFICE OF EMERQENCY SE tOCA['IGENCYUSE ONLY <br /> REPORT BEEN FILED 7 ) CERT FYTM HAVE D15TR(BtiTED.THIS ORMAIIOFiACOOROYIG TO THE <br /> ❑YES NO ❑YES NO <br /> qWWMCfijTNt SInN.T BK K.?MiE DF IS FDRML <br /> F.J R(o�'E2 �_ 1CASE` <br /> aTE. <br /> NEP� <br /> IGNA <br /> m <br /> am, tQ l6 Tj0q)46,33% s T' <br /> LOU REP TIN. ❑ OWNER/OPERATOR ❑ REGIONAL BOARD COMPANY OA AGENCY NAME <br /> SLOCAL AGENCY ❑ OTHER <br /> STATE <br /> 9 NAMES Whe- 5e, i lro , mss PHONE2 1) q6z 29 <br /> us g 355 1� . 9 stoic erry O� 95zo(.0 <br /> FAC�RY NAME aC �° s (fir 3q,i ) z-z� <br /> < ADDRESS <br /> STFNMT ern 000NTY zw <br /> CROSS STREET <br /> LOCAL AGENCY AGENCY NAME CONTACT PERSON PHONE <br /> Z� <br /> W 5� <br /> 71 ,0 <br /> (/��]�/J JJ/j�] <br /> e t� REGIONAL BOARD � HONE ) <br /> 0) (1) ��(�/f U NAME QUANTITYLOST(GALL <br /> ,00 <br /> tu <br /> CtSo/lam IP rcrr., <br /> UNKNOWN <br /> = DATE DISCOVERED HOW DISCOVERED ❑1ffqENTORY CONTROL ❑ SUBSURFACE MONITORING ❑ NUISANCE CONDITIONS <br /> tAi <br /> 2 V C J Y ❑ TANK TEST TANK REMOVAL ❑ OTHER <br /> DATE DISCHARGE BEGAN METHOD USED TO STOP DISCHA (CHECK ALL THAT APPLY) <br /> ICV UNKNOWN ❑REMOVE CONTENTS 96LOSE TANK i REMOVE ❑REPAIR PIPING <br /> Lu <br /> HASOISCRGE BEEN STOPPED T ❑REPAIR TANK ❑CLOSE TANK b FILL IN PLACE E:]CHANGE PROCEDURE <br /> EV <br /> YES ❑ NO iF YES,DATE 5 Z Y ❑REPLACE TANK ❑OTHER <br /> SOURCE OF DISCHARGE CAUSES) <br /> ❑ TANK LEAK IJrACWOVUN ❑ OVERFILL ❑ PY&RFJFAILURE ❑ SPILL <br /> BRI <br /> w ❑ PIPING LEAK ❑ OTHER ❑ CORROSION VUNKNOWN ❑ OTHER <br /> w w CHECK ONE ONLY <br /> F-1 UNDETERMINED ❑ SOIL ONLY GROUNDWATER [:] DRINKINGORINKG WATER-(CHECK ONLY IF WATER WELLS HAVE ACTUALLY BEEN AFFECTED) <br /> CHECK ONE ONLY <br /> ❑ NO ACTION TAKEN ❑ PRELIMINARY SITE ASSESSMENT WORKPLAN SUBMITTED ❑ POLLUTION CHARACTERIZATION <br /> ❑ LEAK BEING CONFIRMED ❑ PRELIMINARY SITE ASSESSMENT UNDERWAY ❑ POST CLEANUP MONITORING IN PROGRESS <br /> ❑ REMEDIATION PLAN ❑ CASE CLOSED(CLEANUP COMPLETED OR UNNECESSARY) ❑ CLEANUP UNDERWAY <br /> CHECK APPROPRIATE ACTION(S) ❑ EXCAVATE 6 DISPOSE(ED) ❑ REMOVE FREE PRODUCT(FP) ❑ ENHANCED BIO DEGRADATION on <br /> J IB MPf sm Dey"A <br /> w ❑ CAP SITE(CD) ❑ EXCAVATE E TREAT(ET) ❑ PUMP&TREAT GROUNDWATER(GT)❑ REPLACE SUPPLY(RS) <br /> Lu< ❑ CONTAINMENT BARRIER(CB) F-1NO ACTION REQUIRED(NA) F-1TREATMENT AT HOOKUP(HU) ❑ VENT SOIL(VS) <br /> ❑ VACUUM EXTRACT(VE) ❑ OTHER(OT) <br /> AWcc E /L4ek Wed- dw <br /> S G� S 5Il' Ah/1 G-e /t 9 yv , <br /> 051"m <br />