Laserfiche WebLink
1 <br /> v <br /> City Of Tracy -2- December 2, 1999 <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre- Comments <br /> 1. Permitting site $3035 <br /> 2. Shallow groundwater survey $9203 EPA 8015 is pre-approved at <br /> & soil sampling: $55/sample and EPA 8260 at <br /> $110/sample. Disposal of 55-gal drums <br /> is pre-approved at $120/drum including <br /> drum cost. Includes report. <br /> 3. Monitoring well installation $9043 Includes report. <br /> 4. 1 year of quarterly $6460 Includes report. <br /> monitoring <br /> TOTAL PRE-APPROVED $ 27,741 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it <br /> to remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Wright Environmental Services, Inc. proposal in my pre- <br /> approval above, please be aware that you will be entering into a private contract: the State of <br /> California cannot compel you to sign any specific contract. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary corrective action work. <br /> The legislation governing the Fund requires that the Fund assist you in procuring contractor and <br /> consultant services for corrective action. I£you need assistance in contracting for corrective <br /> action services, don't hesitate to call me. <br /> California Environmental Protection Agency <br /> Q)Recycled Paper <br />