Laserfiche WebLink
i <br /> "" WELL MONITORING DATA SHEET <br /> Project 4 (Qa 2 - Client &1 kt EY1vi r0VAw _Kfia J <br /> (i Sampler Ar4arl Start Date <br /> Well I D MK/- _3 WellDiameter 3 4 6 S <br /> Total Well Depth Z.o,3Z Depth to Water <br /> Before After Before After <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Referenced to Vf Grade DO Meter (if req'd)- YSr HACH <br /> Purge Method Sampling Method Jailer <br /> Bailer Waterra Disposable Bailer <br /> Disposable Bailer Peristaltic Extraction Port <br /> vQAiddlebur� Extraction Pump Dedicated Tubing <br /> Electric Submersible Other Other <br /> Weil Diameter _Multioiier ,- Well Diameter Muitinlier <br /> �'7 1 3 <br /> P. 0 04 4" 065 <br /> (Gals )X = 4� 3 Gals 3. 0 16 6^ 147 <br /> 1 Case Volume SDecified Volumes Calculated Volume 3" 037 tithe- radius'`•0 163 <br /> Time Temp (OF) pH C�ond Turbidity Gals Removed Observations <br /> wF (OZ if -75 to �7s3 Z r-3 ZC> <br /> 102-7 75 , D 7, 2 Z7Z t > Zoo 5 <br /> z$ 75-o , Z 2 719 > zoo 7 <br /> Did well dewater" Yes N® Gallons actually evacuated 7 <br /> Sampling Time 1033 Sampling Date q- z t -Oa <br /> Sample I D fyi1\/-3 Laboratory Cllr-onjo- L,-ab <br /> Analyzed forPH-G BTEX MTBE TPH-D Other lrvsL ��Y Z�Joc-f <br /> Equipment Blank I D 7me Duplicate I D <br /> Analyzed for TPH-G BTEX MTBE TPH-D Other <br /> O (if req'd) Pre-purge mg'L Post-purge mg/L <br /> ORP (if req'd) Pre-purge rriV Post-purge mV <br /> Blaine Tech Services, Inc, 1680 Rogers Ave., San Jose. wA 9-51 a 2 (A08) _173-06,35 <br />