Laserfiche WebLink
i <br /> Amount of Hazardous Materials Present: <br /> Maximum Groundwater concentrations - Gasoline''; 45,000 ppb benzene = 7,100 ppb; <br /> Toluene = 2,600 ppb; ethylbenzene = 440 ppb; xylenes = 7,500 ppb; MTBE = 670 ppb. <br /> General Site Description: <br /> Active gasoline filling station and convenience store. <br /> C. PROJECT OBJECTIVE(S) (1910.120(b)(3)) <br /> (Description of work area activities planned:) <br /> Drill and install three onsite and three offsite Geoprobe soil borings and three CPT borings onsite. j <br /> Soil and groundwater samples will be collected. <br /> D. PROJECT ORGANIZATION (1910.120(b)(2)) <br /> Team Member Responsibility Type of Training Date of Training <br /> John Sellman Geologist 40-hr 10/94- <br /> Hazwoper/annual <br /> ,refresher latest refresher 3/03 <br /> i <br /> Appendix 7-4 (IForm HS 003) <br /> Page 2 of 13 <br /> Revised: 3/03 <br />